Alpha 3 provided engineering and design services to a major metropolitan electric utility in the Mid-Atlantic Region in support of its $1.5B annual capital investment plan, including its highest profile investment—a10-year, $850M electrical grid improvement project. Our work has included the...
Energy
Related Projects
Engineering & Design
Alpha 3 provided engineering, design, and drafting services on numerous electric utility breaker replacement projects for Sargent & Lundy. The scope of work included protection and controls, layout, and detailed design for the replacement of oil circuit breakers with gas circuit breakers at...
Alpha 3 has provided design and engineering services for numerous substations within an electric utility network in the mid Atlantic region. Services have included protection and controls engineering, including elementary drawing revisions, logic diagrams, and detailed wiring diagrams. Services...
Project Controls Development and Implementation
Alpha 3 was responsible for the development and maintenance of the cost-loaded CPM schedule for reconstruction of the Unit 3 cooling tower. Alpha 3 provided schedule constructability analysis to optimize tower run-time and balance plant operations and construction efficiency by managing schedule...
Alpha 3 provided planning and scheduling support for an outage at Cheswick Generating Station. Alpha 3 provided P6 scheduling support for outage planning, which included boiler reheat tube replacements, generator rotor removal and rewinding, and various balance of plant capital and maintenance...
Alpha 3 provided outage scheduling services for overhauls on the three 182-MW coal-fired units at the Dickerson Generating Station. Major overhauls were completed on Units 1 and 3 and a minor overhaul was completed on Unit 2.
Alpha 3 was retained to provide project controls consulting, including CPM schedule development, resource loading and leveling, and implementation of Oracle-Primavera P6v7 for the management of validation and verification engineering services for three nuclear power plants in China. The plants...
Alpha 3 provided project controls consulting including development, resource-loading, and schedule quality revisions for the engineer's CPM schedule, which had been developed using Microsoft Project.
Alpha 3 provided CPM scheduling services to the structural steel contractor for the construction of this substation in Sayreville, NJ. Scheduling issues addressed included structural steel modifications during the course of the project.
Project Execution Support, Project Management & Control, Construction Management
As owner’s representative, Alpha 3 provided project management and project controls support for the capping and closure of three coal combustion residual (CCR) storage facilities located throughout southern Maryland.
Project Execution Support, Project Management & Control, Construction Management, Procurement & Business Support
Alpha 3 provided project controls management for the integration of contracts to engineer, procure, and construct a WWT plant for the removal of boron and selenium from the scrubber waste stream on a 1,700 MW coal-fired power plant. Alpha 3 provided cost and schedule control through all phases...
Project Management & Control, Procurement & Business Support
Alpha 3 provided management and cost control services for an electric utility's reliability projects, which include the development and implementation of detailed reliability improvement plans, maintenance of 184 substations and 239 substation transformers, and the annual replacement of 2,800...
Project Execution Support, Construction Management, Procurement & Business Support
Alpha 3 provided project management, contractor and equipment procurement services, and construction management for the installation of bulk HCl supply systems for the scrubber waste-water treatment plants at the Chalk Point, Dickerson, and Morgantown Generating Stations. On-site supervision and...
Alpha 3 provided project controls consulting to Nooter Construction Company related to Nooter’s SCR and vacuum furnace installation at the Phillips 66 Bayway Refinery in Linden, NJ. Alpha 3 reviewed Nooter’s original execution scope and performance plan, approved and pending Field Change...
Project Execution Support
As part of the Power Project Management joint venture, Alpha 3 provided both long-range and detailed outage planning for this coal-fired generating station in Tompkins Cove, NY. Work included scope development, planning, and CPM scheduling for the multi-year outage plan and detailed planning for...
Project Management & Control, Construction Management, Procurement & Business Support
Alpha 3 provided project management services, filling the role of Project Controls Manager for the scrubber installation at this 570-megawatt coal-fired power plant. One of three power plants under this $1.7-billion program, the scope of work included the engineering, procurement, and...